News
778
- 21 Jun 2011 ANOTHER DAY ABOVE 2,000 TEU The Container Terminal of Leixões handled 1,296 containers (2,041 TEU) on the 17th June, which became the most intense day on the 25th week, at TCL.On that day eight ships were operated.Along the 25th week, other figures deserve a reference as well. For instance, the number ...
- 15 Jun 2011 “PRIMUS” INAUGURATES AS SHIP OF THE WEEK “Primus” was really the first among 56 ships which called at the Container Terminal of Leixões on the 24th week, considering the number of containers handled.The ship from Lin Lines was at TCL on the 9th June, having handled 1,166 TEU. Arriving from Namibe, “Primus” ...
- 15 Jun 2011 TCL KEEPS ABOVE 10,000 WEEKLY TEU Another week has passed, and once again TCL was able to exceed the 10,000 TEU barrier. This time, on the 24th week.Between the 6th and the 12th June, the Container Terminal of Leixões received 56 ships, and 6,804 containers were handled on the quay (10,734 TEU).This time Th ...
- 08 Jun 2011 “THIES MAERSK” IS THE SHIP OF THE 23rd WEEK “Thies Maersk” was the ship which more containers handled at TCL on the 23rd week.The ship from Maersk Line was at the Port of Leixões on the 3rd and 4th of June, having discharged / loaded 1,241 TEU.The operations began at 5:29 pm on Friday and ended at 7:52 pm the day ...
- 08 Jun 2011 ANOTHER WEEK ABOVE 10,000 TEU To handle more than 10,000 TEU in each working week is becoming a rule at the Container Terminal of Leixões on 2011. That’s what happened again on the 23rd week, which marked the end of May and beginning of June.Along the week, 44 ships demanded at TCL having handled 6,53 ...
- 08 Jun 2011 APDL GOES AHEAD WITH LOGISTICS PLATFORM APDL has just launched a competition for the building of the 1st polo of the future Logistics Platform of the Port of Leixões.The previewed investment is of 17.5 million Euros. The works consist essentially in the infra-structuring of the land of the Gonçalves’ polo, wit ...