News

“CMA CGM BUENOS AIRES” IN THE LIMELIGHT
2012-09-26
mosorio



“CMA CGM Buenos Aires” stood out between the 22 ships which demanded the Leixões Container Terminal on the 38th week.
The primacy justified due to the fact it was the ship stood out as the ship which more containers handled on that week: precisely 1,749 TEU, contributing strongly to the week’s result.
“CMA CGM Buenos Aires” arrived at Leixões on the 20th of September, and began the operations at TCL at 11:26 am, having sailed on the 25th, after concluding the operations of discharging/loading at 3:11 pm.
The long time of stay at TCL was not synonym of less efficiency at the operations. The net productivity on the ship reached 41 movements/hour of effective work.